Wind farm Haven Gent Fase 2

Under Construction

The second Storm wind farm in the Port of Ghent will start production in 2018. It will feature two extra wind turbines on the ArcelorMittal grounds. About 1 year later, the wind farm will be fully operational and produce enough renewable energy for approximately 6.500 families.

The second Storm wind farm in the Port of Ghent will start production in 2018. It will feature two extra wind turbines on the ArcelorMittal grounds. About 1 year later, the wind farm will be fully operational and produce enough renewable energy for approximately 6.500 families.

On the map

In numbers

2
Number of turbines
3,6MW
Electrical power per turbine
130m
Tower height
200m
Tip height
140m
Rotor diameter
23.394MWh
Yearly energy production
Early 2018
Start of works
January 2019
Commissioning
6.500
Yearly number of households provided with green energy