
Wind farm Nassogne
In Procedure
Storm is planning a wind farm with 3 wind turbines located in the rue d'Ambly, on the territory of the municipalities of Nassogne and Marche-en-Famenne. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8.100 households.
Storm is planning a wind farm with 3 wind turbines located in the rue d'Ambly, on the territory of the municipalities of Nassogne and Marche-en-Famenne. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8.100 households.