Wind farm Rumillies
In Procedure
Storm and CLEF are planning a wind farm in Rumillies, south of the A8/E429 and east of the E42 interchange (Hainaut). Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8860 households.
Storm and CLEF are planning a wind farm in Rumillies, south of the A8/E429 and east of the E42 interchange (Hainaut). Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8860 households.