Wind farm Zelzate

In Procedure

Storm and Eneco are planning the construction of a wind farm south of the E34 in Zelzate (East-Flanders). The construction of the wind farm will begin early in 2018. About a year later, the wind farm will be operational and produce enough green power to meet the annual consumption of about 6,000 households.

Storm and Eneco are planning the construction of a wind farm south of the E34 in Zelzate (East-Flanders). The construction of the wind farm will begin early in 2018. About a year later, the wind farm will be operational and produce enough green power to meet the annual consumption of about 6,000 households.

On the map

In numbers

2
Number of turbines
3,4MW
Electrical power per turbine
143m
Tower height
200m
Tip height
114m
Rotor diameter
21.848MWh
Yearly energy production
Early 2018
Start of works
January 2019
Commissioning
6.000
Yearly number of households provided with green energy