Two new sites under construction: follow the progress in Minderhout and Zandvliet.

Storm

Our wind farms

Location # Turbines Total energy output in MW (Planned) commissioning date Status
Rumillies 3 10.2 TBD In Procedure
Mourcourt 3 9.6 TBD In Procedure
Drongen 3 9.6 TBD In Procedure
Assenede 3 9.6 TBD In Procedure
Evergem 1 3.2 TBD In Procedure
Tongeren-Vreren 4 12 TBD In Procedure
Melsele 3 6 2019 In Procedure
Ollignies 1 3 2019 In Procedure
Haven Gent Fase 2 2 7.2 2019 In Procedure
Zelzate 2 6.8 2019 In Procedure
E40 / TBD In Procedure
Beveren 3 6 TBD In Procedure
Geraardsbergen 2 4 TBD In Procedure
Desselgem 2 4 2016 Operational
Dilsen-Stokkem 2 4 2015 Operational
Geel 3 6 2015 Operational
Genk 1 2 2015 Operational
Haven Gent 3 9 2017 Operational
Lokeren 4 9.2 2017 Operational
Maasmechelen 2 4 2014 Operational
Minderhout 1 3 2018 Under Construction
Meer 3 9.6 2015 Operational
Wachtebeke 2 5 2012 Operational
Westerlo 2 4.1 2014 Operational
Wielsbeke 3 6.9 2014 Operational
Zandvliet 1 3 2018 Under Construction