
.avif)
Solar farmErpe-Mere
Solar farm
Erpe-Mere
Ga naar de volgende sectie
Storm is developing a 10.2-hectare agrivoltaic solar park in Erpe-Mere. The project site is situated to the south-west of the municipality, on a former land reclamation site and old landfill. The solar park follows the principle of dual land use: current agricultural activity (pasture) will be maintained, whilst renewable energy is generated on the same area. In addition to energy production, the focus is on ecological added value. The design includes provision for the planting of hedges and trees, which will contribute to biodiversity, landscape quality and natural buffering
Operationeel
In aanbouw
In development
10.2
ha
Maximum number of panels
10
MWp
Maximum electric power
9000
MWh
GWh
Annual energy production
2775
Households provided with sustainable energy annually
De mooiste beelden
van het zonnepark
No items found.
.avif)