![](https://storm-prod.imgix.net/images/Windpark-Meer-luchtfoto.jpeg?auto=format&fit=crop&h=1024&q=85&w=2560&s=4d0ef6755020ca11ef9df92af1412383)
Wind farm Houyet
In Procedure
Storm and Aspiravi are planning the construction of a wind farm south of the N97 and west op the A4/E411. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 7.300 households.
Storm and Aspiravi are planning the construction of a wind farm south of the N97 and west op the A4/E411. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 7.300 households.