
Wind farm Léglise
In Procedure
Storm is planning a wind farm in Léglise on both sides of the A4/E25, in between Léglise and Mellier. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 15.000 households.
Storm is planning a wind farm in Léglise on both sides of the A4/E25, in between Léglise and Mellier. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 15.000 households.