Wind farm Léglise

In Procedure

Storm is planning a wind farm in Léglise on both sides of the A4/E25, in between Léglise and Mellier. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 15.000 households.

Storm is planning a wind farm in Léglise on both sides of the A4/E25, in between Léglise and Mellier. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 15.000 households.

On the map

In numbers

7
Number of turbines
4MW
Electrical power per turbine
119m
Tower height
180m
Tip height
122m
Rotor diameter
56.000MWh
Yearly energy production
15.000
Yearly number of households provided with green energy

Ask us a question

*Mandatory field