Wind farm Rumillies

In Procedure

Storm and CLEF are planning a wind farm in Rumillies, south of the A8/E429 and east of the E42 interchange (Hainaut). Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8860 households.

Storm and CLEF are planning a wind farm in Rumillies, south of the A8/E429 and east of the E42 interchange (Hainaut). Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8860 households.

On the map

In numbers

3
Number of turbines
4,8MW
Electrical power per turbine
112m
Tower height
180m
Tip height
136m
Rotor diameter
32.800MWh
Yearly energy production
8.860
Yearly number of households provided with green energy

Ask us a question

*Mandatory field