![](https://storm-prod.imgix.net/images/meenwaun_1.jpg?auto=format&fit=crop&h=1024&q=85&w=2560&s=1326982daa599aa94e95207c6afc735a)
Wind farm Nassogne
In Procedure
Storm is planning a wind farm with 3 wind turbines located in the rue d'Ambly, on the territory of the municipalities of Nassogne and Marche-en-Famenne. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8.100 households.
Storm is planning a wind farm with 3 wind turbines located in the rue d'Ambly, on the territory of the municipalities of Nassogne and Marche-en-Famenne. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8.100 households.