Wind farm Courrière

In Procedure

Storm has submitted a permit request for the wind farm in Courrière, east of the A4/E411 in between the towns of Courrière et Assesse. The project consists of 3 turbines with a maximum height of 180m. With a power of 12MW, this wind farm will produce enough green energy to meet the annual consumption of about 6500 households.

Storm has submitted a permit request for the wind farm in Courrière, east of the A4/E411 in between the towns of Courrière et Assesse. The project consists of 3 turbines with a maximum height of 180m. With a power of 12MW, this wind farm will produce enough green energy to meet the annual consumption of about 6500 households.

On the map

In numbers

3
Number of turbines
3,6MW
Electrical power per turbine
125m
Tower height
180m
Tip height
117m
Rotor diameter
24.000MWh
Yearly energy production
Mid 2022
Start of works
January 2023
Commissioning
6.500
Yearly number of households provided with green energy

A public inquiry is currently active from June 15, 2020 to July 15, 2020: see notice of inquiry below.

The non-technical summary of the impact study and its annexes can be downloaded through the link below.