Wind farm Assenede

In Procedure

In collaboration with Eneco, Storm is planning the construction of a wind farm just south of the E34 in Assenede in the province of East Flanders. Once the wind farm is operational, it will provide enough renewable energy for a total of 8.600 families.

In collaboration with Eneco, Storm is planning the construction of a wind farm just south of the E34 in Assenede in the province of East Flanders. Once the wind farm is operational, it will provide enough renewable energy for a total of 8.600 families.

On the map

In numbers

3
Number of turbines
3,2MW
Electrical power per turbine
123m
Tower height
180m
Tip height
114m
Rotor diameter
30.000MWh
Yearly energy production
8.600
Yearly number of households provided with green energy

Ask us a question

*Mandatory field