Wind farm Assenede

In Procedure

In collaboration with Eneco, Storm is planning the construction of a wind farm just south of the E34 in Assenede in the province of East Flanders. Once the wind farm is operational, it will provide enough renewable energy for a total of 8.600 families.

In collaboration with Eneco, Storm is planning the construction of a wind farm just south of the E34 in Assenede in the province of East Flanders. Once the wind farm is operational, it will provide enough renewable energy for a total of 8.600 families.

On the map

In numbers

3
Number of turbines
8MW
Electrical power per turbine
150m
Tower height
238m
Tip height
175m
Rotor diameter
59.000MWh
Yearly energy production
16.850
Yearly number of households provided with green energy