Wind farm Houyet

In Procedure

Storm and Aspiravi are planning the construction of a wind farm south of the N97 and west op the A4/E411. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 7.870 households.

Storm and Aspiravi are planning the construction of a wind farm south of the N97 and west op the A4/E411. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 7.870 households.

On the map

In numbers

3
Number of turbines
4,3MW
Electrical power per turbine
112m
Tower height
180m
Tip height
136m
Rotor diameter
29.126MWh
Yearly energy production
7.870
Yearly number of households provided with green energy

Ask us a question

*Mandatory field