Wind farm Houyet

In Procedure

Storm and Aspiravi are planning the construction of a wind farm south of the N97 and west op the A4/E411. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8,100 households.

Storm and Aspiravi are planning the construction of a wind farm south of the N97 and west op the A4/E411. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 8,100 households.

On the map

In numbers

3
Number of turbines
4MW
Electrical power per turbine
110m
Tower height
180m
Tip height
140m
Rotor diameter
30.000MWh
Yearly energy production
Early 2021
Start of works
8.100
Yearly number of households provided with green energy