Wind farm Houyet

In Procedure

Storm and Aspiravi are planning the construction of a wind farm south of the N97 and west op the A4/E411. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 7.300 households.

Storm and Aspiravi are planning the construction of a wind farm south of the N97 and west op the A4/E411. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 7.300 households.

On the map

In numbers

3
Number of turbines
4,3MW
Electrical power per turbine
125m
Tower height
200m
Tip height
150m
Rotor diameter
27.000MWh
Yearly energy production
7.300
Yearly number of households provided with green energy

Ask us a question

*Mandatory field