Wind farm Remichampagne deuxième ligne

In Procedure

Storm is planning a wind farm in Vaux-sur-Sûre, between Sibret and Cobreville, along the E25. This wind farm will produce enough green energy to meet the annual electricity consumption of approximately 15.4000 families.

Storm is planning a wind farm in Vaux-sur-Sûre, between Sibret and Cobreville, along the E25. This wind farm will produce enough green energy to meet the annual electricity consumption of approximately 15.4000 families.

In numbers

4
Number of turbines
6,2MW
Electrical power per turbine
149m
Tower height
230m
Tip height
162m
Rotor diameter
57.000MWh
Yearly energy production
15.400
Yearly number of households provided with green energy