![](https://storm-prod.imgix.net/images/Windpark-Wachtebeke-lucht_4.jpeg?auto=format&fit=crop&h=1024&q=85&w=2560&s=4906502314057ed2e11210e3c4d10e45)
Wind farm Léglise
In Procedure
Storm is planning a wind farm in Léglise on both sides of the A4/E25, in between Léglise and Mellier. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 15.000 households.
Storm is planning a wind farm in Léglise on both sides of the A4/E25, in between Léglise and Mellier. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 15.000 households.