Wind farm Retie

In Procedure

The Storm wind farm Retie is planned south of the E34 in Retie (Antwerp). Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 13.000 households.

The Storm wind farm Retie is planned south of the E34 in Retie (Antwerp). Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 13.000 households.

On the map

In numbers

4
Number of turbines
3,6MW
Electrical power per turbine
130m
Tower height
200m
Tip height
142m
Rotor diameter
45.500MWh
Yearly energy production
13.000
Yearly number of households provided with green energy

Ask us a question

*Mandatory field