Wind farm Dinez-Fontenaille

In Procedure

Storm and Aspiravi are planning a wind farm along the E25 in Houffalize, between the municipalities of Dinez, Fontenaille and Sommerain. Once operational, the wind farm will produce enough green energy to meet the annual consumption of about 7.000 families.

Storm and Aspiravi are planning a wind farm along the E25 in Houffalize, between the municipalities of Dinez, Fontenaille and Sommerain. Once operational, the wind farm will produce enough green energy to meet the annual consumption of about 7.000 families.

On the map

In numbers

2
Number of turbines
6,6MW
Electrical power per turbine
145m
Tower height
230m
Tip height
170m
Rotor diameter
29.300MWh
Yearly energy production
7.000
Yearly number of households provided with green energy