Our Wind Farms

On the map

From A-Z

Location # Turbines Total energy output in MW (Planned) commissioning date Status
Léglise 7 28 2022 In Procedure
Courrière 3 12 2022 In Procedure
Overpelt 3 / TBD In Procedure
Berlare 1 3 TBD In Procedure
Retie 4 14.4 TBD In Procedure
Zoersel 2 6.8 TBD In Procedure
Meer Zuid 1 3.6 TBD In Procedure
Rumillies 3 10.8 2021 In Procedure
Mourcourt 3 10.8 2021 In Procedure
Drongen 3 9.6 TBD In Procedure
Assenede 3 9.6 TBD In Procedure
Evergem 1 3.2 TBD In Procedure
Tongeren-Vreren 4 12 TBD In Procedure
Melsele 3 6 2019 Under Construction
Ollignies 5 18 2021 In Procedure
Haven Gent Fase 2 2 7.2 2019 Under Construction
Zelzate 2 6.8 2019 In Procedure
E40 / TBD In Procedure
Beveren 3 6 TBD In Procedure
Geraardsbergen 2 4 TBD In Procedure
Desselgem 2 4 2016 Operational
Dilsen-Stokkem 2 4 2015 Operational
Geel 3 6 2015 Operational
Genk 1 2 2015 Operational
Haven Gent 3 9 2017 Operational
Lokeren 4 9.2 2017 Operational
Maasmechelen 2 4 2014 Operational
Minderhout 1 3 2018 Operational
Meer 3 9.6 2015 Operational
Wachtebeke 2 5 2012 Operational
Westerlo 2 4.1 2014 Operational
Wielsbeke 3 6.9 2014 Operational
Zandvliet 1 3 2018 Operational

Our operational wind farms in numbers

29
Number of turbines
69,8MW
Total electrical power of all operational turbines
194.400MWh
Total yearly energy production
2.361
Total number of participants
55.500
Total yearly number of households provided with green energy

Ask us a question