Operational

This particular wind farm can be found on the sites of ArcelorMittal in the Sea Port of Ghent (in the province of East Flanders). The wind farm has been operational since early 2017 and produces renewable energy that matches the annual use of about 8.200 families. 248 residents of Wachtebeke, Zelzate, Mendonk, Desteldonk, Evergem and Sint-Kruis-Winkel have already signed up for the Storm CV cooperative.

This particular wind farm can be found on the sites of ArcelorMittal in the Sea Port of Ghent (in the province of East Flanders). The wind farm has been operational since early 2017 and produces renewable energy that matches the annual use of about 8.200 families. 248 residents of Wachtebeke, Zelzate, Mendonk, Desteldonk, Evergem and Sint-Kruis-Winkel have already signed up for the Storm CV cooperative.

On the map

In numbers

3
Number of turbines
3MW
Electrical power per turbine
139m
Tower height
200m
Tip height
122m
Rotor diameter
28.800MWh
Yearly energy production
Early 2016
Start of works
April 2017
Commissioning
248
Total number of participants
8.200
Yearly number of households provided with green energy