
Wind farm Haven Gent Phase 2
Operational
The second Storm wind farm in the Port of Ghent features two extra wind turbines on the ArcelorMittal grounds. It has been be fully operational since Fall 2019 and produces enough renewable energy for approximately 6.500 families.
The second Storm wind farm in the Port of Ghent features two extra wind turbines on the ArcelorMittal grounds. It has been be fully operational since Fall 2019 and produces enough renewable energy for approximately 6.500 families.