Wind farm Mabompré

In Procedure

Storm and Aspiravi are planning the construction of a wind farm consisting of 7 wind turbines on the territory of Houffalize and Bastogne, parallel to the A26/E25. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 17.000 households.

Storm and Aspiravi are planning the construction of a wind farm consisting of 7 wind turbines on the territory of Houffalize and Bastogne, parallel to the A26/E25. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 17.000 households.

On the map

In numbers

3
Number of turbines
6MW
Electrical power per turbine
125m
Tower height
200m
Tip height
150m
Rotor diameter
32.730MWh
Yearly energy production
8.850
Yearly number of households provided with green energy