Wind farm Mabompré
In Procedure
Storm and Aspiravi are planning the construction of a wind farm consisting of 7 wind turbines on the territory of Houffalize and Bastogne, parallel to the A26/E25. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 17.000 households.
Storm and Aspiravi are planning the construction of a wind farm consisting of 7 wind turbines on the territory of Houffalize and Bastogne, parallel to the A26/E25. Once the wind farm is operational, it will produce enough green power to meet the annual consumption of about 17.000 households.